Verification evidence assembled for 340 units in nine working days.
Gathering this ourselves took weeks per contractor. Now it arrives with the quote.
Asbestos Network is an independent verification body. We do not carry out surveys, testing or removal, and we take no commission on work you award.
Independent verification body · No commission on your job
Regulation 4 doesn't ask whether you meant well. It asks what you found, what you recorded, and who you appointed to do the work — and it expects evidence for all three.
What kind of building?
The duty to manage applies to all non-domestic premises, and to the common parts of residential blocks.
What has prompted this?
This determines which type of survey or specialist you actually need — they are not interchangeable.
Where is the building?
We only ever match you with suppliers who genuinely hold verified status for your region.
We're identifying verified suppliers who hold current status for your region and this type of work.
Suppliers currently holding FibrePrint Verified™ status
Independent checks passed before entry to the register
Maximum months before a supplier is re-verified
Commission we take on the work you award. We are paid by membership, not by your job.
Five duties, in plain English. Most enforcement action follows a failure in one of them — and in every case, the defence is documentary.
In practiceTake reasonable steps to determine the location, amount and condition of any asbestos-containing materials. For most pre-2000 buildings this means commissioning a management survey.
In practiceUnless there is strong evidence a material does not contain asbestos, you must treat it as though it does. Assumption is not a defence; analysis is.
In practiceAn asbestos register recording location and condition, maintained as the building changes. A survey from 2009 in a filing cabinet is not a live record.
In practiceA written plan setting out how the risk from each material will be managed, with priority actions, responsibilities and review dates. It must be acted on, not merely held.
In practiceThe information must reach contractors, maintenance staff and anyone else who may work on the fabric — before they start. This is where most incidents originate.
Plain-English summary for orientation. Not legal advice — refer to the Regulations and HSE ACOP L143.
From a single domestic garage roof to an NHS estate — verified suppliers working across every sector the register covers.




Every supplier on the register has produced documentary evidence against five criteria, and is re-examined on a fixed interval. Status is withdrawn when evidence lapses.
| Criterion | Evidence required | Review |
|---|---|---|
| Competence01 | Current BOHS P402 / P405 certification or equivalent, plus HSE licence class where licensed work is offered. | 12 months |
| Insurance02 | Public liability and professional indemnity schedules, checked against the scope of work the supplier offers. | On renewal |
| Health & safety03 | Sample plan of work and risk assessment, assessed against CAR 2012 and current HSE guidance. | 12 months |
| Compliance04 | Waste carrier registration, statutory notification history and consignment record-keeping procedure. | 12 months |
| Conduct05 | Client references, complaint and dispute record, and ongoing feedback from work awarded through the register. | Continuous |
Why this matters to you. If an incident occurs, the question asked is not whether your contractor seemed capable. It is what you checked, and what you kept. Every appointment made through the register comes with that evidence already assembled.
Start a duty checkEach discipline is verified separately. A firm approved for surveys is not automatically approved for removal.
Locating and recording asbestos-containing materials to satisfy the duty to manage under Regulation 4.
312 verified 02Fully intrusive surveys required before any work that will disturb the fabric of the building.
248 verified 03Accredited identification of suspect materials, with results normally returned inside 48 hours.
76 verified 04HSE-licensed removal of higher-risk materials, with statutory notification and four-stage clearance.
184 verified 05Written plans, priority actions and scheduled re-inspection programmes that keep the record live.
140 verified 06Category A awareness and refresher training for maintenance and estates teams working on pre-2000 stock.
54 verifiedYour enquiry is never sold on, never broadcast to a list, and never sent to a supplier whose status has lapsed.
Three questions establish the building, the trigger and the region.
60 secondsOnly suppliers holding current verified status for that discipline and region.
Within 2 hoursUp to three quotes, each with verification evidence already attached.
No obligationPublished with the client's permission. Identifying details of the building are withheld.
Verification evidence assembled for 340 units in nine working days.
Gathering this ourselves took weeks per contractor. Now it arrives with the quote.
Refurbishment survey delivered before a fixed programme start date.
The distinction between survey types was explained properly for once. It changed what we commissioned.
Damaged AIB isolated and analysed within 48 hours of report.
We rang at 4pm expecting a voicemail. Someone talked us through securing the area that evening.
Verified status is granted per region, so a supplier cannot appear for an area they do not genuinely work in.
Figures updated monthly · Last revision July 2026
Firms on the register receive enquiries from dutyholders who have already accepted the standard behind the mark — so the conversation starts at scope and price, not at whether you are legitimate.
If yours isn't here, the advice line is free and staffed by people who do this daily — 0808 175 3392.
If you own, occupy, manage or have any responsibility for non-domestic premises, the duty may fall to you — often through the repair and maintenance obligations in a lease or contract. Where responsibility is shared, it is shared in proportion to those obligations. It is rarely nobody.
A management survey supports normal occupation and the duty to manage. A refurbishment and demolition survey is fully intrusive and is required before any work that will disturb the fabric. Commissioning the wrong one is the single most common and most expensive error we see.
No — and removal is frequently the worse option. Material in good condition and unlikely to be disturbed is usually safest managed in place, recorded and monitored. Unnecessary removal creates both cost and risk.
Nothing, and there is no obligation to appoint anyone. We are funded by supplier membership rather than commission, so quotes are not inflated to cover a referral fee and we have no financial interest in which supplier you choose.
They stop receiving enquiries immediately and are removed from the register until evidence is restored. Where a lapse affects work already in progress, we contact the client directly.
Stop work, keep people out of the area, and do not attempt to clean or cover it. Then call the advice line. Requests flagged as a disturbance are routed to suppliers offering same-day attendance.
Tell us what you're looking at and what condition it's in. We'll return a priority rating and connect you to a verified specialist who can confirm it properly.
What can you see?
Choose the closest match. Only laboratory analysis can confirm a material — this narrows it down.
What condition is it in?
Condition drives urgency far more than the material itself. Undamaged material is often safest left alone.
Where is the building?
We match only against suppliers holding current verified status for your region.
—
Fibre release potential is what determines how the work must be done — and whether an HSE licence is legally required to do it.
Indicative reference only · Identification must be confirmed by accredited laboratory analysis
A management survey booked before intrusive work leaves the material undiscovered — and the programme stops on day one.
AIB and lagging require an HSE licence. Firms that offer to remove them without one are not cutting cost, they are transferring risk to you.
Without a clearance certificate and consignment notes, you cannot evidence that the area was made safe or the waste properly disposed of.
Every supplier we match you with has produced documentary evidence against each of these — and loses status the moment it lapses.
BOHS P402 / P405 certification and licence class matched to the work offered.
Review12 monthsPublic liability and professional indemnity schedules checked against scope.
ReviewOn renewalSample plan of work and risk assessment reviewed against CAR 2012.
Review12 monthsWaste carrier registration, notification history and consignment records.
Review12 monthsClient references, complaint record and feedback from work awarded.
ReviewContinuousMaterial, condition and location produce a priority rating you can act on immediately.60 seconds
Only firms holding current verification for that licence class and region receive your request.Within 2 hours
Up to three quotes, each arriving with its verification evidence already attached.No obligation
Measured from request submitted to first verified supplier reply, across the last rolling quarter.
We found lagging behind a plant room panel on a Friday. Someone competent was on site Monday morning.
If your question isn't here, the advice line is free and staffed by people who do this daily — 0808 175 3392.
Stop any work in the area, keep people out, and do not sweep, vacuum, wet or cover it. Disturbance is what releases fibres, and well-meant tidying is a common cause. Then run the identifier or call the advice line so the right type of specialist is sent.
No, and neither can anyone else. Appearance narrows the possibilities — which is what this tool does — but only accredited laboratory analysis of a sample can confirm whether a material contains asbestos and which type.
Higher-risk materials such as insulating board and pipe lagging can generally only be removed by a contractor holding an HSE asbestos licence, with statutory notification before work starts. Lower-risk materials like cement sheet often do not require a licence, but still require competence and correct disposal.
No. Material in good condition and unlikely to be disturbed is usually safest recorded, sealed if appropriate, and monitored in place. Unnecessary removal creates disturbance, cost and risk that managing in place avoids.
Nothing, with no obligation to appoint anyone. We are funded by supplier membership rather than commission on your job, so quotes are not inflated to cover a referral fee and we have no interest in which supplier you choose.
Requests flagged as actively disturbed are routed to suppliers offering same-day attendance. For everything else, the median first response is under two hours and most surveys are booked within three to five working days.
Firms holding verified status receive enquiries from dutyholders who have already accepted the standard behind the mark — so the conversation starts at scope and price.